• Stable Running Pop Can Beer Filling Capping Packing Product Line
  • Stable Running Pop Can Beer Filling Capping Packing Product Line
  • Stable Running Pop Can Beer Filling Capping Packing Product Line
  • Stable Running Pop Can Beer Filling Capping Packing Product Line
  • Stable Running Pop Can Beer Filling Capping Packing Product Line
  • Stable Running Pop Can Beer Filling Capping Packing Product Line

Stable Running Pop Can Beer Filling Capping Packing Product Line

After-sales Service: Online Video
Warranty: 2 Years
Type: Piston Filling Machine
Automatic Grade: Automatic
Material Type: Liquid
Filling Valve Head: Multi-Head
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
BGF
Feed Cylinder Structure
Multi-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Certificate
CE, ISO9001
Processing Type
Beer
Processing
Filling
Control
PLC
State
New
Automatic
Fully Automatic
Transport Package
Export Standard Packages
Specification
ISO9001
Trademark
Beyond
Origin
China, Zhangjiagang
HS Code
8422309010
Production Capacity
1000PCS/Year

Product Description

Stable Running Pop Can Beer Filling Capping Packing Product Line

Stable Running Pop Can Beer Filling Capping Packing Product Line

Based on foreign advanced technologies, we developed this new GDF model of balance filling machine according to requirements from drink industry.

This machine is mainly applicable for beer bottled filling and capping.It is a more ideal filling and capping machine for middle or small-scale drink factories.

It has characteristics of more compact in structure, more reliable and safety in operation, ease in maintenance.It has an infinite variable speed device, so its output can be changed freely.

Monoblocks:Filler/ Capper (Crown-corker) with extra Bottle Washer for refundable glass bottle filling.
Triblocks:Rinser/ Filler/ Capper (Crown-corker) for new glass bottles or for PET bottle filling with one main drive for all working functions applying Overpressure (isobaric) Filler together with single or double pre-evacuation air-pump.

It is the best choice for the beer filling factory.


 Stable Running Pop Can Beer Filling Capping Packing Product Line

Model
BGF12/6 BGF18/6 BGF24/6  BGF32/8 
Production capacity(500ml)(b/h)  1000-1200 2000-3000  4000-5000  6000-8000 
total power(kw)  1.5 1.5  3.75  5.6 
Dimension (L*W*H)(mm)  1700x1100x2300         1830x1320x2300   1950x1580x2500   2100x1850x2500
Total weight(kg) 2000  2400  3000  3500 

Stable Running Pop Can Beer Filling Capping Packing Product LineStable Running Pop Can Beer Filling Capping Packing Product LineStable Running Pop Can Beer Filling Capping Packing Product LineStable Running Pop Can Beer Filling Capping Packing Product LineStable Running Pop Can Beer Filling Capping Packing Product Line


Service Term

1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.


Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 

We supply complete solution for the juice producing plant ,including Water treatment system /bottle blowing machine/ Washing filling capping machine/ Code sprayer / Automatic labeling machine / Automatic packing machine / Automatic Palletizer system
 


 
Stable Running Pop Can Beer Filling Capping Packing Product LineStable Running Pop Can Beer Filling Capping Packing Product Line
Stable Running Pop Can Beer Filling Capping Packing Product Line






 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now