High Quality 5-10L Bottled Water Filling Machine Filling Machine Packaging Machine High Technological Filling Machine water filling machine/bottle filling machine
5L, 10L Bottled water Filling Machine
1. Pure water filling machine is highly automatic, with washing, filling and capping there functions in one monobloc.
2. The parts contacting water uses stainless steel SUS304, so it is protected from corrosion of washing agent. It is safe and clean.
3. This filling machine suits for non-carbonated drinks, such as mineral water, pure water and etc.
Production capacity(b/h) |
500-1200b/h |
Filling volume |
4L,5L, 6L,8L,10L |
Filling heads |
6, 8, 10 |
Bottle specification |
All shapes of PVC,PP,PET Plastic bottles |
Filling precision |
<2% |
Gas source pressure |
0.6-0.8Mpa |
Air consumption |
50L/Min |
Water consumption |
5m 3 /h |
Power |
3.34Kw |
Weight |
400Kg |
Overall dimension |
Filler: 2500x680x1680mm
Capper:1200x540x1723mm |
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
Connection:
Address: XiGang jinfeng town,
Zhangjiagang city, jiangsu province