High Quality Pet Water Bottle Washing Filling Capping Packing Plastic Bottle Machine High Technological Machine with production line
1. The machine is mainly used in the beverage filling operations. It is suitable for non-carbonated drink filling machine.
2. Bottle washing, filling and capping are achieved in one machine. The contact time is short between material and the outside.
3. The advanced OMRON programmed controller (PLC) is adopted to control the machine to run automatically while a transducer is used in the bottle -entering chains to adjust speeds and coordinated with the transducer of the main machine to make the operations of moving bottle forward steadily and reliably.
4. It is convenient to operate with higher automation because every part of the machine is inspected to run with photo electricity. On the bases, the filling parts of the machine can be changed into filling methods of lower vacuum. The filling category of lower vacuum (Z type machine) is applicable in glass bottles, filling alcohol, soy and such like materials. The aluminum theft proof cap and plastic cap can be adopted.
5. The suspending bottle-neck clamping design makes the bottle stable during the high-speed moving conditions. By changing a few parts, it can meet the need of production of different types of bottles easily.
6. The new generation of stainless steel grab is adopted and the grabs have no contact with the area above the bottle's screw thread. Nozzles in the grab can guarantee the complete wash of the interior of the bottle.
Main technical parameters
Model: CGF18/18/6
Capacity: 4000(base on 0.5L bottle)
Filling precision: <5mm (surface location)
PET bottle Specifications: 0.5L~1.5L
Bottle neck 20-40,
Bottles height: 150-300mm,
Bottle diameter: 50-100mm;
Apply to the screw-shaped plastic caps(26-35mm)
Bottle washing pressure: 0.20Mpa
Water consumption: 1800kg/h
Air Source pressure: Atmospheric pressure
Air Consumption: 0.3cbm
Total power: 5.3kw
Total weight: 3000kg
Overall dimension: 2400*1670*2350
Our BEYOND Washing Filling&Capping machine is your best choose.
Model |
CGF16/12/6 |
CGF18/18/6 |
CGF24/24/8 |
CGF32/32/12 |
CGF40/40/12 |
CGF48/48/12 |
Production Capacity: 500ml(B/h) |
4000 |
6000 |
10000 |
14000 |
17000 |
20000 |
Suitable Bottle Standard: (mm) |
150-300 |
150-340 |
150-340 |
150-340 |
150-340 |
150-340 |
Suitable Cap Standard: (mm) |
φ 50-φ 110 |
Filling Pressure: (Mpa) |
0.2-0.3 |
Installed Capacity: (L) |
3.13 |
3.84 |
3.84 |
5.6 |
6.3 |
7.3 |
Filling Temperature: |
Room Temperature |
Room Temperature |
Room Temperature |
Room Temperature |
Room Temperature |
Room Temperature |
Overall Size: L× W× H(mm) |
2400× 1670× 2350 |
2470× 1970× 2350 |
2865× 2170× 2350 |
3700× 2570× 2350 |
3800× 2950× 2400 |
4500× 3400× 2400 |
Total Weight: (kg) |
2500 |
3000 |
4000 |
5000 |
6000 |
|
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight