Gold Member Since 2010
Audited Supplier
Zhangjiagang Beyond Machinery Co., Ltd.

Water Bottling Machine, Packaging Machine, Bottle Machine manufacturer / supplier in China, offering High Technology 5gallon Barrel Mineral Water Filling Machine, Filling Equipment for Canned Carbonated Drinks, Automatic Carbonated Beverage Canning Filler Equipment and so on.

(/ )

Supplier Homepage Product Water Filling Machine 10-20L(3&5gallon) Bottle High Technology 5gallon Barrel Mineral Water Filling Machine

High Technology 5gallon Barrel Mineral Water Filling Machine

FOB Price: US $10,000-30,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $10,000-30,000/ Piece
Get Latest Price
Production Capacity: 22 Sets Per Month
Transport Package: Wooden Packages, Suitable for Long Way Distance
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: QGF-150
  • Automatic Grade: Automatic
  • Filling Valve Head: Multi-Head
  • Dosing Device: Capacity Cup
  • Packaging Container Lifting Structure: Pneumatic Lifting
  • Packaging: Barrel
  • Certificate: ISO9001
  • Control Mode: PLC
  • Processing: Washing Filling and Capping
  • Trademark: Beyond
  • Origin: Zhangjiagang China (Mainland)
  • Type: Volumetric Filling Machine
  • Material Type: Liquid
  • Feed Cylinder Structure: Single-Room Feeding
  • Filling Principle: Gravity
  • Structure: Linear
  • Packaging Material: Plastic
  • Warranty: 2 Years
  • PLC: Mitsubishi
  • Machine: Barreled Water Filling Machine
  • Specification: CE; SGS
  • HS Code: 8422301090
Product Description
High Technology 5gallon Barrel Mineral Water Filling Machine 
High Technology 5gallon Barrel Mineral Water Filling Machine
1) QGF series barreled production line consists of washing, filling and capping.

2) It is suitable for filling of all kinds of round and square barrels.

3) The production line adopts electric-program control. It has safe devices, such as interlock, signal, automatic check and so on.

4) Its key parts are imported and their quality is reliable.

5) The whole machine is made of stainless steel.

6) It meets the demands of food hygiene.

7) Its structure is reasonable and its operation is convenient.

8) It is ideal equipment for producing mineral water, super-pure water, space water and distilled water.
High Technology 5gallon Barrel Mineral Water Filling Machine
Technical parameters
TYPEQGF-100QGF-240QGF-300QGF-450QGF-600QGF-900   QGF-1200 
filling heads
barrel size(mm)Φ 276x490               
Capacity(b/h)60-100 100-240 250-300 400 800 800 800 
gas pressure(MPa)0.4-0.6   0.4-0.60.4-0.6 0.4-0.6 0.6 0.6 0.6 
gas consumption(m3/min)0.37 0.37 0.6 0.8 1.5 1.8 
Motor power kw1.38 1.75 3.8 3.8 7.5 9.75 13.5 
Rated voltage380V/50HZ           
Weight (kg)680800 1500 2100 3000 3500 4500 
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 
 
Connection:
 
Phone:+86 18921971286
Tel: +86-512-55398012
Fax: +86-512-55398012
Address: XiGang jinfeng town,
Zhangjiagang city, jiangsu province
 
Send your message to this supplier
Avatar
Ms. Joanna
Manager
*From:
To: Ms. Joanna
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now