Gold Member Since 2010
Audited Supplier
Zhangjiagang Beyond Machinery Co., Ltd.

Soda Water Filling, Beverage Machine, Beverage Filling Machine manufacturer / supplier in China, offering Carbonated Beverage Bottling Producing Line with Ce, High Technology 5L Bottled Water Filling Equipment with Ce, Automatic Cooking Oil Bottle Filling Capping Machinery with Ce and so on.

(/ )

Supplier Homepage Product Carbonated Drink Filling Machine Carbonated Beverage Bottling Producing Line with Ce

Carbonated Beverage Bottling Producing Line with Ce

FOB Price: US $10,000-40,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $10,000-40,000/ Piece
Get Latest Price
Port: Zhangjiagang, China
Production Capacity: 20sets Per Month
Payment Terms: L/C, T/T, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: DCGF16-12-6
  • Automatic Grade: Automatic
  • Filling Valve Head: Multi-Head
  • Dosing Device: Capacity Cup
  • Packaging Container Lifting Structure: Pneumatic Lifting
  • Packaging: Bottle
  • Certificate: ISO9001
  • Processing: Washing Filling Capping
  • Trademark: Beyond
  • Specification: CE; SGS
  • HS Code: 8422309010
  • Type: Volumetric Filling Machine
  • Material Type: Liquid
  • Feed Cylinder Structure: Single-Room Feeding
  • Filling Principle: Gravity
  • Structure: Rotary
  • Packaging Material: Composite Materials
  • Power: by Order
  • State: New
  • Transport Package: Wooden Case Packing
  • Origin: China, Zhangjiagang
Product Description
Carbonated Beverage Bottling Producing Line With CE 



Characteristics:

1. The series equipment is used in production gas containing water of PET polyester bottle-packing carbonated beverage.

2. It carries out washing bottle, filling and capping on one machine.

3. The whole machine designing is reasonable.

4. The appearance is beautiful and the maintenance is convenient.

5. It adopts bottle handing technology to make changing bottle more convenient, faster and easier.

6. The main machine adopts advanced PLC control, touch screen and no-bottle, no-cap system.

7. The key electric elements are from famous international brand.
ModelDCGF16-12-6DCGF18-18-6DCGF24-24-8DCGF32-32-10DCGF40-40-12
Production Capability(500ml b/h)2000-30003000-50005000-70007000-1000010000-15000
Filling precision≤+5mm(Liguid Level)
Filling pressure(Mpa)≤0.4
PET bottle specification(mm)Bottle diameter:Ø50- Ø100;  Height:150-310
Suitable cap shapePlastic Screw Cap
Total Power(kw)4.45.26.26.27.5
Weight(kg)25003500450060007200
Dimension (mm)2250×1650×22502600×1965×22502980×2200×22503880×2200×22504000×2250×2500
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 
 
Connection:
 
Phone:+86 18921971286
Tel: +86-512-55398012
Fax: +86-512-55398012
Address: XiGang jinfeng town,
Zhangjiagang city, jiangsu province
 
 
Send your message to this supplier
Avatar
Ms. Joanna
Manager
*From:
To: Ms. Joanna
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category