Factory Produce Fully Automatic Canned Carbonated Drinking Filling Capping Packing Machine
Automatic, rotary, rinser-filler-capper monobloc, for carbonated drink into 350ml to 1500ml. Round, PET bottles. Using standard prethreaded plastic closures.
1. The filling machine is a full automatic multiple-function joint unit, integrating washing, filling and capping into one unit.
2. It applies to washing, filling and sealing different kinds of non-carbonated drinks such as fruit juice, oil, vinegar, wine, fruit wine, mineral water, and pure water.
3. This filling machine has features of unique design, novel style, complete functions, multi-purpose, strong adaptable, easy in operation, high automaticity. It is the ideal filling equipment in China.
Carbonated Beverage Filling machine is mainly used in the beverage filling operations.
4. The product line is mainly used in washing, filling and sealing carbonated beverage such as carbonated drinks, cola, iced tea and carbonated mineral water and so on.
5. The construction is advanced, . The performance is stable. The operation and maintain are easy. And the speed can be adjusted infinitively and accords with the standards. It is an ideal choice for small and middle scale drink factories.
6. All the line is composed by rotary washer, balanced pressure filler, screw type sealer and conveying sysytem. The capcity is from 3000b/h to 40000b/h
Our Beyond Carbonated Beverage Filling machine is your best choice.
Model |
GFP-12 |
GFP-24 |
GFP-32 |
Production capacity |
1500-2500 |
3000-6000 |
6000-8000 |
Number of filling heads |
12 |
24 |
32 |
Suitable bottle |
glass bottle
PET bottle
pop-top can |
Inner diameter of bottle mouth≥ 15mm |
Bottle OD≤ 150mm |
OD: 53mm-65mm |
Height of bottle: 90mm-133mm |
Height of bottle: 200mm-320mm |
Power (Kw) |
0.75 |
1.1 |
1.5 |
Overall dimensions (mm) |
1000x800x2000 |
1330x1260x2200 |
1450x1700x2500 |
Weight (Kg) |
1200 |
1600 |
2000 |
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
We supply complete solution for the juice producing plant ,including Water treatment system /bottle blowing machine/ Washing filling capping machine/ Code sprayer / Automatic labeling machine / Automatic packing machine / Automatic Palletizer system