Jiangsu, China
Business Type:
Manufacturer/Factory, Trading Company
Plant Area:
1001~2000 square meters
Management System Certification:
ISO 9001
Main Markets:
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, ...
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workday
OEM/ODM Service

Water Bottling Machine, Bottle Machine, Packing Machine manufacturer / supplier in China, offering High Technology Pure Water and Mineral Water Filling Machine, Water Treatment System Drinking Water Treatment Machine, Hollow Super Filter Machinery with High Speed and so on.

Gold Member Since 2010
Audited Supplier
Supplier Homepage Products Water Filling Machine 0.25-2L Bottle High Technology Pure Water and Mineral Water Filling Machine

High Technology Pure Water and Mineral Water Filling Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $10,000-40,000/ Piece
Port: Zhangjiagang, China
Production Capacity: 20sets Per Month
Payment Terms: L/C, T/T
Type: Volumetric Filling Machine
Automatic Grade: Automatic
Material Type: Liquid
Filling Valve Head: Multi-Head
Feed Cylinder Structure: Single-Room Feeding
Dosing Device: Capacity Cup

You Might Also Like

Loading...

Basic Info

Model NO.: CGF16-12-6
Filling Principle: Gravity
Packaging Container Lifting Structure: Pneumatic Lifting
Structure: Rotary
Packaging: Bottle
Packaging Material: Plastic
Driven Type: Electric
Voltage: 380V/220V 50Hz
Dimension(L*W*H): 2400*1760*2350mm
Weight: 2500kg
Certification: CE, SGS
Material: SUS304
Processing: Washing Filling and Capping
Machine: Pure Water and Mineral Water Fi
Trademark: BEYOND
Transport Package: International Standard Export Package
Specification: CE/SGS
Origin: Zhangjiagang, Jiangsu, China
HS Code: 8422309010

Product Description

High Technology Pure Water and Mineral Water Filling Machine
High Technology Pure Water and Mineral Water Filling Machine

 
1. This equipment is used in production of bottled non-carbonated drink of fruit juice, fruit wine, mineral water and pure water.

2. The magnetic torque is used for screw capping.

3. The filling and capping will be stopped automatically when there is no bottle.

4. Spring cramps are used in the bottle rinsing process.

5. The empty bottles can be turned over 180° Along the conveying rail. Rinsing the bottles inside and outside. The efficiency of bottle rinsing is high.

6. The whole machine is controlled by PLC with touch-screen as the human-machine interface.

7. The power of the screw capping can also be fixed, and the caps will not be damaged, the capping is reliable.

8. The liquid filling technology of gravity which learned from latest technology from Japan and Germany is used in the design.
 Model
CGF16/12/6CGF18/18/6CGF24/24/8CGF32/32/12CGF40/40/12CGF48/48/12
Production capacity:500ml (B/h)4000600010000140001700020000
Suitable bottle standard(mm)150-300150-340150-340150-340150-340150-340
Suitable cap standard(mm)φ50-φ110
Filling pressure(Mpa)0.2-0.3
Installed power3.133.843.845.66.37.3
Filling temperatureRoom temperatureRoom temperatureRoom temperatureRoom temperatureRoom temperatureRoom temperature
Overall size:
L*W*H(mm)
2400*1760*23502470*1970*23502865*2170*23503700*2570*23503800*2950*24004500*3400*2400
Total weight(kg)250030004000500060007000
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 

High Technology Pure Water and Mineral Water Filling Machine
High Technology Pure Water and Mineral Water Filling Machine

 
 

Send your message to this supplier

*From:
*To:
avatar Ms. Joanna
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now