Jiangsu, China
Business Type:
Manufacturer/Factory, Trading Company
Plant Area:
1001~2000 square meters
Management System Certification:
ISO 9001
Main Markets:
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, ...
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workday
OEM/ODM Service

Filling Machine, Filling Plant, Beverage Filling Machine manufacturer / supplier in China, offering Bottle Cooling and Warming Machine (PLJ), Water Treatment System Drinking Water Treatment Machine, Hollow Super Filter Machinery with High Speed and so on.

Gold Member Since 2010
Audited Supplier

Bottle Cooling and Warming Machine (PLJ)

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $10,000-40,000/ Piece
Port: Zhangjiagang, China
Production Capacity: 20sets Per Month
Payment Terms: L/C, T/T
Condition: New
Customized: Customized
Voltage: 380V
Composition: Sterilization Equipment
Processing Material: Garden Products
Process: Thermal Processing

You Might Also Like

Loading...

Basic Info

Model NO.: PLJ
Control: PLC
State: New
Certificate: ISO9001
Quality: High
Automatic: Full Automatic
Trademark: Beyond
Transport Package: Export Standard Packages
Specification: CE, ISO9001
Origin: China, Zhangjiagang
HS Code: 8422303090

Product Description

Bottle Cooling and Warming Machine (PLJ)
 
 Profile:
PL type spraying cooling machine are developed on base of absorbing advanced technique from home and abroad. With three zones treatment of circulated cooling water and the treatment time can be adjusted according to the user's requirement. The machine can applicable to all types non-carbonated material such as tea, juice, sauce. The machine body is made of SUS304 stainless steel and can run stably and smoothly.
It is suitable for cooling and heating for all kinds of bottled or canned hot canned hot beverage and carbonated beverage.

The machine reduce the temperature of hot filling drinks to 36-40, or increase the temperature of cold filling carbonic acid drinks to 36 -- 40.

It is used in PE bottled hot tea drinks and carbonic acid drinks cold filling production line. The machine can eliminate the condensed water on the external side of bottles, keep bottle clean and dry.

It makes bottles easier for labeling and packing. Productivity: 5000-20000B/H, spray time about 15-20 minutes

 
ModelWB-1WB-2
Production Capability(b/m)80-150250-400
Highest sterilization temperature)Max 100Max 100
Surface speed of conveyer belt(mm/min)110-553200-1000
Circular water volume(m³/h)1525
Pressure of steam main pipe (Mpa)0.40.4
Overall dimension(L×W×H)(mm)12000×1914×170014000×2900×1700
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 
 
Bottle Cooling and Warming Machine (PLJ)
Bottle Cooling and Warming Machine (PLJ)

 

 

Send your message to this supplier

*From:
*To:
avatar Ms. Joanna
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now