High Quality Fully Automatic Beer Beverage Liquid Filling Packaging Machine with Ce (BGF Series)
Technical features
1Filling valve adopts high-accuracy mechanical filling valve, with mechanism no bottle, no vacuum.
2Outside mounted mechanical filling valves. There is no spring or sealing parts inside the valve.
3Twice vacuum, with high pressure foam stimulation device.
4Adopt open type gear and gearbox combination transmission. Adopt variable frequency stepless timing with large adjustment scope.
5The transmission system equips automatic lubrication with grease, high-efficiency, little noise and long-life.
6While filling gas or beer, if bottle is broken due to quality problem, the filling valve will close automatically. It also equips automatic broken bottle washing device.
7Equip fully stainless steel magnetic cap hopper. Cap sorting, discharge and feeing are all conveyed by magnetic force, and the cap is not easy to become distorted. Mass and smooth cap discharge. Reliable capping with automatic unloading function to lower the bottle loss rate.
8Centering guide adopts double-leader type with pre-covering function. The bottle infeed and outfeed is table and reliable.
9The carousel and capping head elevation is electrical to adapt to various bottles with different height.
10The product level in the carousel is controlled by electric probe, with stable level and filling.
Based on foreign advanced technologies, we developed this new balance filling machine according to requirements from drink industry.
1. This machine is mainly applicable for beer bottled filling and capping.
2. It is a more ideal filling and capping machine for middle or small-scale drink factories.
3. It has characteristics of more compact in structure, more reliable and safety in operation, ease in maintenance.
4. It has an infinite variable speed device, so its output can be changed freely.
It is the best choice for the beer filling factory.
Model |
BGF12/6 |
BGF18/6 |
BGF24/6 |
BGF32/8 |
Production capacity(500ml)(b/h) |
1000-1200 |
2000-3000 |
4000-5000 |
6000-8000 |
total power(kw) |
1.5 |
1.5 |
3.75 |
5.6 |
Dimension (L*W*H)(mm) |
1700x1100x2300 |
1830x1320x2300 |
1950x1580x2500 |
2100x1850x2500 |
Total weight(kg) |
2000 |
2400 |
3000 |
3500 |
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight