Jiangsu, China
Business Type:
Manufacturer/Factory, Trading Company
Plant Area:
1001~2000 square meters
Management System Certification:
ISO 9001
Main Markets:
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, ...
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workday
OEM/ODM Service

Filling Machine, Filling Machinery, Beverage Machine manufacturer / supplier in China, offering Carbonated Filling Machine Cola Filling Machine (TL-500), Water Treatment System Drinking Water Treatment Machine, Hollow Super Filter Machinery with High Speed and so on.

Gold Member Since 2010
Audited Supplier
Supplier Homepage Products Carbonated Drink Filling Machine Carbonated Filling Machine Cola Filling Machine (TL-500)

Carbonated Filling Machine Cola Filling Machine (TL-500)

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $10,000-40,000/ Piece
Port: Zhangjiagang, China
Production Capacity: 20sets Per Month
Payment Terms: T/T, Western Union
Condition: New
Customized: Customized
Voltage: 380V
Composition: Filling Machine
Processing Material: Gravity
Process: Frozen and Chilled

You Might Also Like

Loading...

Basic Info

Model NO.: CGDF
Certificate: ISO9001
Power: by Order
Processing: Washing Filling Capping
Control: PLC
Trademark: Beyond
Transport Package: Wooden Case Packing
Specification: 3000-12000bph
Origin: China, Zhangjiagang
HS Code: 8422303090

Product Description

Carbonated Filling Machine Cola Filling Machine (TL-500)
Carbonated Filling Machine Cola Filling Machine (TL-500)

1)This syrup cooler adopts freon compressor.

2)It could cool down normal temperature syrup at pre-set temperature. Lower temperature from the cooler would be fed into beverage mixer.

3)This is accessory equipments on carbonated drink producing line.

4)This carbonated drinks bottle filling line is used in production gas containing water of PET polyester bottle-packing carbonated beverage, such as Coca cola, Pepsi-cola, Spirit drink etc.

5) The magnetic torque is used for screw capping., in order to assure capping quality.

6) The whole machine designing is reasonable, the appearance is beautiful and the maintenance is convenient.

7) It carries out washing bottle, filling and capping on one machine.

8)The main machine adopts advanced PLC control, Touch screen and no-bottle, no-cap system.

9)Adopting equal pressure filling principle and current spring valves in order to assure beverage quality.

10)It adopts bottle handing technology to make changing bottle more convenient, faster and easier.
ModelTL-500
CompressorTotal closed
Volume500liters
Evaporation area1.5--2m2
Refrigerating6000kcal/h
Temp.of outlet syrup0--5degree C
Power3kw
Overall dimension1100x900x2278mm
Weight500kg
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight

 
 
Carbonated Filling Machine Cola Filling Machine (TL-500)
Carbonated Filling Machine Cola Filling Machine (TL-500)

 
 

Send your message to this supplier

*From:
*To:
avatar Ms. Joanna
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now